    I will be taking FAR this thursday and have been reviewing for the last two weeks with the Becker software. Today I took one of the final exams and at first seemingly didnt score very well on the simulations. After going back and reviewing the sims, specifically the journal entries, I found out that I had the correct entries but the accounts within were not in the order that the Becker simulation program wanted them to be in.

    Specifically:

    My Answer:

    CR: Old Building 150000

    CR: Gain 7000

    DR: New Building 72000

    DR: Cash 25000

    DR Accumulated Depreciation 60000

    Program Answer

    DR: New building 72000

    DR Cash 25000

    DR Accumulated Depreciation 60000

    CR Old building 150000

    CR Gain 7000

    My answer got 0/18 points from the program when it is pretty much the same thing. Is this just a glitch in the Becker program or is the actual exam graded this way too? Any help would be appreciated.

    BEC - 89
    FAR - 90
    AUD - 95
    REG - 82

Viewing 3 replies - 1 through 3 (of 3 total)
  • Author
    Replies
  • #293654

    I don't know which final exam sim you're talking about, but in general I would just point out why would you put in credits before debits? I'm not 100% sure if they would count this as wrong on the exam (since it's computer graded), but I would just be safe and do the standard debits then credits format for any entry I had.

    AUD - 85
    FAR - 78 (lol@ FAR Sims)
    REG - 85
    BEC - August

    #293655
    Anonymous
    Inactive

    I had the exact same experience. I entered the cash debit first and then the debit for building and Becker had it in a different order, counting both incorrect. I hope that the CPA exam isn't so picky about the order of the debits and the credits, as long as we get the correct amounts for each account. I haven't seen anything in the material stressing that there is a particular order when dealing with multiple debit or credit entries.

    #293656
    Anonymous
    Inactive

    I had the exact same problem and actually emailed all of my Becker teachers and asked around and this is what I got….

    “you have nothing to worry about. You're just saying that you got all of the proper debits and credits, you just listed them in a different order, correct? This is just a software limitation, and they'll accept it in any order on the exam. “

    I also heard that if for some reason they do not catch it on the exam (as it is a software limitation), then to apply for a regrade and they will change it. It is a glitch on the Becker system but supposedly they have fixed it on the AICPA tests…

    Just to play it safe tho I am going to write my JE's in the order that they appear on the balance sheet (that is the technically correct way to do them).

    I take mine on Tues! Good luck!